All the way to site
From selection and duty review through export crating to remote commissioning — the equipment is followed, not just shipped.
Delivery & service,
GPTECH, exporting to 30+ countries
Built in the plant
Spools are cut, welded and pressure-tested before they ship, then delivered as numbered sections. Site work becomes assembly, not fabrication.
Site install time cut by 60 %,
Measured on a hyperscale campus in Huzhou
Assembled clean
1,500 m² of Class 1000 and 1,000 m² of Class 100 — every spool cleaned, dried and sealed before it leaves the room.
Semiconductor & biopharmaceutical grade,
GPTECH Shanghai R&D Center
Tested, every one
Coordinate measurement, oil-residue detection, particle counting and helium leak testing. Nothing ships on assumption.
100 % helium leak or hydrostatic tested,
Before despatch, every unit